SMACNA Arizona Contractor: Bel-Aire Mechanical, Inc.
Project Name:Corporate Headquarters for The Dial Corporation, a Henkel Company.
Description: The LEED Certified project, located at the 101 and Scottsdale Road, is a 335,000 square-foot building featuring four floors above grade and three levels below-grade, including a 1,000-space underground parking garage.
Owner: The Dial Corporation, a Henkel Company.
General Contractor: Sundt Construction, Inc.
Services Provided: Design-assist pre-construction services, Building Information Modeling and CAD services. Construction services include pipefitting, plumbing, sheet metal, air handling, chillers, process piping, ventilation systems, temperature control system, commissioning, testing and balancing. Bel-Aire Mechanical pre-fabricated the majority the HVAC and plumbing systems in its own new manufacturing facility. This included steam headers, manifolds, chilled water piping, tower piping, air handling-chilled water headers, steam piping, plumbing batteries and duct work systems.
Contract Amount: $20 million
Start/End Dates: April 2007-December 2008
Project Manager: Jim Novak
Mechanical Design Engineer: CH2M Hill
Once completed, this project will become the new corporate headquarters for The Dial Corporation, a Henkel Company. Dial is one of America's leading manufacturers of consumer brands, including wellknown products such as Dial® soap, Purex® laundry detergent, Renuzit® air fresheners and Right Guard® antiperspirants/deodorants. The four-story, 335,000-square-foot building will house corporate administration, training functions and Research and Development, which will feature wet laboratories for product development. Also included will be FDA and EPA-sanctioned pilot plants to simulate product-manufacturing processes, think-tank spaces, conference and training facilities, a full-service cafeteria and food service facility, print/copy resource center, fitness center, and green roof gardens. It will sit atop a three-story, 1,000-space, underground parking garage.
Building Information Modeling was used extensively on the project. This cutting-edge technology replaces two-dimensional construction drawings with multi-dimensional computer models, allowing the project team to identify and resolve challenges during design and avoid costly and time-consuming changes during construction. Dial's new corporate headquarters is expected to obtain LEED certification by the U.S. Green Building Council.

|